钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Guangzhou Steel plant structure constituting
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sbshouses.cn

Guangzhou Steel plant structure constituting

Time:[2015-5-20]  Hits:4076

Guangzhou Steel plant structure constituting

Guangzhou Steel plant structure first divided into five parts:
1, the foundation embedded parts, (stable Steel plant structure).
2, column, H beam, I-beam, C-shaped steel tube maybe (two C-shaped steel butt).
3, beam, using C and H-beam steel.
4, purlins, the general C-shaped steel, channel.
5, wall roof with colored steel plate, one is monolithic tile color steel (steel tile).

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号